North Berry Creek unilateral right-of-way and road construction permit finding of no significant impact

dc.contributor.authorUnited States. Bureau of Land Management. Roseburg District Office
dc.date.accessioned2008-11-20T19:27:30Z
dc.date.available2008-11-20T19:27:30Z
dc.date.issued2008-01
dc.description4 pp. Section 7, T 29 S, R 7 W. Captured January 28, 2008.en
dc.description.abstractDetermines no environmental impact statement is needed for project proposing construction of an extension to BLM Road No. 29-7-7.0 in Section 7, T. 29 S., R. 7 W. The road extension, approximately 675 feet in length, would be temporary and unsurfaced, and located primarily on a ridge top location. Approximately 440 feet of construction would be located on BLM-managed lands, as the proposed road route crosses back and forth at three locations along the property line between BLM lands and the Delores P. Loftin Trust lands that are to be logged. This action would be authorized under an O&C Right-of-Way Permit. BLM timber cut in association with the road construction would be purchased by Swanson Group, LLC through a negotiated timber sale.en
dc.identifier.urihttps://hdl.handle.net/1794/7883
dc.language.isoen_USen
dc.relation.ispartofseriesNEPA;
dc.subjectRight of way -- Oregon -- Roseburg Regionen
dc.subjectPublic lands -- Oregon -- Roseburg Regionen
dc.subjectForest roads -- Oregon -- Design and constructionen
dc.titleNorth Berry Creek unilateral right-of-way and road construction permit finding of no significant impacten
dc.title.alternativeFinding of no significant impact: North Berry Creek unilateral right-of-way and road construction permiten
dc.typeOtheren

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
North_Berry_Creek_Unilateral_Right-of-Way_and_Road_Construction_Permit_Draft.pdf
Size:
33.19 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
Name:
license.txt
Size:
1.79 KB
Format:
Item-specific license agreed upon to submission
Description: