Engineering road improvement and realignment decision document

dc.contributor.authorUnited States. Bureau of Land Management. Roseburg District Office
dc.date.accessioned2008-12-13T00:31:46Z
dc.date.available2008-12-13T00:31:46Z
dc.date.issued2007-06-11
dc.description10 pp. Sections 19 and 21; T26S, R07W; W.M. Captured July 24, 2007.en
dc.description.abstractAnnounces decision to authorize the implementation of the Proposed Action Alternative as described in the Engineering Improvement and Realignment Environmental Assessment. The Engineering Improvement and Realignment will occur on two Bureau of Land Management roads; the Hubbard Creek Road (26-7-19.1) and the Long Ranch Road (26-3-20.3) located in Upper Umpqua Fifth-Field Watershed. Within Hubbard Creek and Camp Creek drainages the BLM proposes to repair and/or improve 1.3 miles of the existing Hubbard Creek Road (26-7-19.1) and 0.4 miles of the existing Long Ranch Road (26-7-20.3).en
dc.identifier.urihttps://hdl.handle.net/1794/8098
dc.language.isoen_USen
dc.relation.ispartofseriesNEPA;
dc.subjectLogging -- Oregon -- Roseburg Regionen
dc.subjectForest roads -- Oregon -- Maintenance and repairen
dc.subjectPublic lands -- Oregon -- Roseburg Regionen
dc.titleEngineering road improvement and realignment decision documenten
dc.title.alternativeDecision document: Engineering road improvement and realignmenten
dc.typeOtheren

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Engineering_Road_Improvement_and_Realignment.pdf
Size:
96.58 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
Name:
license.txt
Size:
1.79 KB
Format:
Item-specific license agreed upon to submission
Description: